Skip to content

Commit 4eceab6

Browse files
LastStepclaude
andcommitted
chore(station): Plan 21 close-out — memory + status update
PR #46 merged d14edbe. Plan 08 Phase C shipped via Plan 21 (C1 + C2); C3 stays deferred permanently. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
1 parent d14edbe commit 4eceab6

2 files changed

Lines changed: 5 additions & 5 deletions

File tree

station/Playbook/Status.md

Lines changed: 3 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -35,12 +35,14 @@ description: Live task tracker. Update this file at the start and end of every w
3535
|------|------|-------|------------|
3636
<!-- Better trigger sections promoted to In Progress — 2026-04-16, planning session -->
3737
<!-- UI overhaul (P2) — promoted to In Progress as Plan 12, removed 2026-04-17 -->
38-
| Better trigger sections — Phase C (new sensors) | 08 | tech-lead | Phases A+B shipped; Phase C paused while UI/UX Phase 3 ships |
38+
<!-- Plan 08 Phase C shipped via Plan 21 / PR #46 (2026-04-21): compact-recovery sensor + context-guard verify/plan patterns. C3 deferred permanently per original plan note. -->
3939

4040
## Recently Done
4141

4242
| Task | Plan | Agent | Date |
4343
|------|------|-------|------|
44+
| Session-start context dedup + Phase C sensors — session-context redundancy cuts, context-guard verify/plan patterns, new compact-recovery sensor, UX prefs moved to memory.md Feedback (PR #46 squash `d14edbe`) | 21 | general-purpose | 2026-04-21 |
45+
| Better trigger sections — Phase C (new sensors: compact-recovery + context-guard expansion) **shipped via Plan 21 / PR #46**; C3 deferred | 08 | general-purpose | 2026-04-21 |
4446
| Security scanning infra — Go 1.25.8 bump, golangci-lint v2 + pin, Dependabot, govulncheck CI, CodeQL workflow, gitleaks history audit clean (PRs #28 #29 #30 #31 #40 #41) | 20 | general-purpose | 2026-04-21 |
4547
| Pre-launch bug sweep — 8 OSS-blocker fixes: CRLF, cross-workspace tree, dedup, spinner errors.Join, harness polish (PR #27 squash `a44e447`) | 19 | general-purpose | 2026-04-21 |
4648
| BubbleTea foundation + theme system — harness migration across init/add/remove/update (PR #26 squash `2ce63f6`) | 15 | general-purpose | 2026-04-20 |

station/agent/Core/memory.md

Lines changed: 2 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -13,13 +13,11 @@ description: Tech Lead Agent working memory — flags, work state, notes.
1313

1414
## Work State
1515

16-
**Current task:** Idle. Session wrap-up PR #44 squash-merged 2026-04-21; main `fe89423`.
16+
**Current task:** Idle. PR #46 squash-merged 2026-04-21; main `d14edbe`.
1717
**In flight (other tracks):** None.
1818
**Blocked on:** Nothing.
1919
**Loose ends (uncommitted):** None.
20-
**Last completed:** PR #44 session wrap-up (2026-04-21-plan-20-and-group-g.md log + Backlog stale-worktree audit update), squash-merged `fe89423`. Prior: PR #43 `5248212` Group G closeout + CodeQL v3→v4 deprecation backlog item. Dependabot Group G (8 PRs squash-merged 2026-04-21): #39 ansi patch, #38 go-isatty patch, #37 x/term 0.36→0.42 (rebased 1×), #36 setup-node v6, #35 setup-go v6, #34 golangci-lint-action v9, #33 upload-pages-artifact v5, #32 goreleaser-action v7. Release-notes review confirmed no breaking impact (no `packageManager` field → setup-node auto-cache inactive; no dotfiles in dist → upload-pages-artifact v4 exclusion safe; goreleaser-action v7 inputs unchanged). Plan 20 core (6 PRs): #28 #29 #30 #31 #40 #41; wrap-up PR #42 `9cf577e`; gitleaks 0/156.
21-
22-
Bundle: 4 Tier 1 fresh-install blockers (CRLF defence via .gitattributes + `normalizeShellLF`; `showWriteResults` cross-workspace bucket-by-top-segment; `applyCustomFileSelection` dedup via `appendUnique`; spinner `errors.Join` at ~30 sites + Warning surfaces) with 4 Tier 2 harness polish items (SpinnerStep goroutine `recover`; `NewConditional` nil-predicate guard; Esc-back predicate re-eval via harness SetPrior-before-Reset + `Conditional.Reset` re-evaluation; `bonsai add` drop duplicate NoteStep). Issue-to-implementation workflow end-to-end, worktree-isolated dispatch (general-purpose agent, ~15min wall), 6 new tests + 3 subtests all green. Plan doc: `Plans/Active/19-pre-launch-bug-sweep.md`. Session log: `Logs/2026-04-21-plan-19-bug-sweep.md`.
20+
**Last completed:** PR #46 `d14edbe` — Plan 21 session-start context dedup + Plan 08 Phase C sensors (C1 compact-recovery + C2 context-guard verify/plan patterns; C3 deferred permanently). session-context sensor dump reduced 34.3KB→30.9KB (~10%); drops end-of-session misfire reminder, protocol memory.md + session-start.md auto-injections, full FieldNotes when empty, full Reports/Pending cat → summary. session-start.md protocol rewritten short. UX preferences moved from station/self-awareness.md (-54 lines) to memory.md Feedback (+54). New sensor: `compact-recovery` (SessionStart, matcher=compact) fires only after /compact; session-context now matcher=`startup|resume|clear`. Prior: PR #44 session wrap-up (2026-04-21-plan-20-and-group-g.md log + Backlog stale-worktree audit), squash `fe89423`. Plan 20 core (6 PRs): #28 #29 #30 #31 #40 #41; wrap-up PR #42 `9cf577e`; gitleaks 0/156. Group G Dependabot: 8 PRs merged 2026-04-21 (#32-#39).
2321

2422
## Notes
2523

0 commit comments

Comments
 (0)