Skip to content

docs: fix workflow chaining devnote date#815

Merged
andreatnvidia merged 1 commit into
mainfrom
andreatgretel/docs/workflow-chaining-date
Jul 13, 2026
Merged

docs: fix workflow chaining devnote date#815
andreatnvidia merged 1 commit into
mainfrom
andreatgretel/docs/workflow-chaining-date

Conversation

@andreatnvidia

Copy link
Copy Markdown
Contributor

📋 Summary

Corrects the publication date for the workflow-chaining devnote to match its July 13, 2026 publication. The card is moved to preserve reverse chronological ordering.

🔗 Related Issue

N/A

🔄 Changes

  • Update the "Pause, Inspect, Resume" devnote date from June 25 to July 13, 2026
  • Move the card above the July 2 devnote

🧪 Testing

  • make check-fern-docs passes
  • Ruff check and format pass
  • Unit tests: N/A - documentation-only change
  • E2E tests: N/A - documentation-only change

✅ Checklist

  • Follows commit message conventions
  • Commits are signed off (DCO)
  • Architecture docs updated (N/A - documentation metadata only)

Signed-off-by: Andre Manoel <amanoel@nvidia.com>
@andreatnvidia
andreatnvidia marked this pull request as ready for review July 13, 2026 20:18
@andreatnvidia
andreatnvidia requested a review from a team as a code owner July 13, 2026 20:18
@github-actions

Copy link
Copy Markdown
Contributor

Fern preview: https://nvidia-preview-pr-815.docs.buildwithfern.com/nemo/datadesigner

Fern previews include the docs-website version archive with PR changes synced into latest. Notebook tutorials are rendered without execution outputs in previews.

@greptile-apps

greptile-apps Bot commented Jul 13, 2026

Copy link
Copy Markdown
Contributor

Greptile Summary

This PR updates the devnotes index metadata for the workflow chaining post.

  • Moves the "Pause, Inspect, Resume" card above the July 2 devnote.
  • Changes its displayed date to July 13, 2026.

Confidence Score: 5/5

This looks safe to merge.

  • No blocking issues found in the changed documentation metadata.
  • The updated card order matches the new July 13 date.

Important Files Changed

Filename Overview
fern/versions/latest/pages/devnotes/index.mdx Updates one BlogCard date and reorders it to match the stated chronological order.

Reviews (1): Last reviewed commit: "docs: fix workflow chaining devnote date" | Re-trigger Greptile

@github-actions

Copy link
Copy Markdown
Contributor

Thanks for the tidy fix, @andreatgretel — dates on the dev-notes index are easy to let drift, so nice catch.

Summary

This documentation-only change corrects the "Pause, Inspect, Resume" devnote card date from Jun 25, 2026 to July 13, 2026 and moves the card to the top of the <BlogGrid> so the list stays in reverse-chronological order. The implementation matches the stated intent exactly: 8 additions / 8 deletions in a single file, a pure card move + date edit.

Findings

No blocking issues. A couple of confirmations from checking the surrounding context:

  • Ordering is correct. After the move, the card sequence reads July 13 → July 2 (Image Generation) → Jun 1 (Nemotron-Personas) → …, so reverse-chronological order holds.
  • Date matches the published date. July 13, 2026 lines up with the referenced publication date, and there's no competing date field in the linked post (posts/annotate-hard-pages-review-gates.mdx has no frontmatter date), so nothing else needs to be synced.
  • Format is consistent with the neighboring July 2, 2026 card ("Month D, YYYY"), and the href, authors, and image on the moved card are unchanged.

Suggestions — Take it or leave it

fern/versions/latest/pages/devnotes/index.mdx — date-format consistency (optional, out of scope)

  • What: The grid mixes two abbreviation styles — July 13, 2026 / July 2, 2026 (full month) vs. older cards like Jun 1, 2026 / May 28, 2026 (abbreviated). This PR didn't introduce the inconsistency and shouldn't be expanded to fix it.
  • Why: Purely cosmetic; worth noting only so it's on the radar for a future sweep.
  • Suggestion: Leave as-is for this PR. If desired later, a separate PR could normalize all cards to one style.

What Looks Good

  • Minimal and surgical — the diff does exactly one thing (move + date correction) with no incidental edits, which makes it trivial to verify.
  • Ordering was preserved intentionally, not just the date bumped in place — that's the detail that keeps the index readable and shows care.
  • PR description is accurate and the testing checklist correctly scopes this as docs-only (no unit/E2E tests needed).

Verdict

Ship it (with nits) — The change is correct, self-consistent, and matches its stated intent. The only note is a pre-existing, optional date-format inconsistency that is explicitly out of scope for this PR.


This review was generated by an AI assistant.

@andreatnvidia
andreatnvidia merged commit a337ff2 into main Jul 13, 2026
66 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants